01 / The challenge
A good starting point.
The existing membrane had visible staining and a patchwork of earlier repairs. Work had to accommodate rooftop ventilation equipment and maintain access to the occupied building without interrupting everyday operations.
02 / The approach
A considered solution.
The work area and equipment routes were agreed with the building manager. The membrane system and vulnerable transitions were renewed, with particular attention to drains, penetrations and the roof perimeter. Completion records identified the areas around the rooftop equipment for future maintenance.
03 / The result
The complete picture.
A clean, continuous membrane now unifies the roof. Equipment remains accessible, perimeter details are consistent, and the building manager has a practical record of the materials, completed scope and recommended routine observations.