01 / The challenge
A good starting point.
The existing shingles had faded, several edges were lifting, and patch repairs around the dormer and chimney were no longer a lasting solution. The owners wanted to retain the familiar character of their home while resolving those vulnerable transitions.
02 / The approach
A considered solution.
The work was planned around the house’s intersecting roof planes. The old covering was removed, the deck checked, and a coordinated underlayment and flashing system installed before laying new charcoal architectural shingles. Particular attention went to the brick chimney, dormer walls and roof valleys.
03 / The result
The complete picture.
A consistent charcoal finish now follows every roof line, with renewed flashing and carefully finished eaves. The project concluded with a walkthrough, a review of the installation details and a clear set of product and care records.